All projects
Warehouse · Chennai
Landmark Group
Warehouse racking dismantling under difficult conditions
Approximately 500 tonnes of warehouse material handled through dismantling, removal, loading, liquidation and scrap sale.
Approx. 500 tonnesTop-floor workExtreme-heat conditions

Verified scope
One connected operating chain
The published record is limited to public-safe scope confirmed in the Ogoldy project evidence set.
01Labour-intensive rack dismantling
02Removal and loading
03Recoverable-material segregation
04Liquidation
05Scrap sale
What this demonstrates
